A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached One 4-port 1Gbps IVE adapter PowerVM Standard Edition. They need to add a GX++ adapter and cable it to an I/O drawer.
Which of the following must also be ordered?()

A.A second IVE adapter
B.A second processor card
C.PowerVM Enterprise Edition
D.An additional cable-management arm


您可能感興趣的試卷

你可能感興趣的試題

2.單項(xiàng)選擇題The Power 720 is offered with how many cores?()

A.1, 2, or 4
B.2, 4, or 6
C.2, 4, or 8
D.4, 6, or 8

3.單項(xiàng)選擇題Which of the following solutions provides maximum core density per rack?()

A.Power 730
B.PS700 Blades
C.PS702 Blades
D.PS703 Blades

5.單項(xiàng)選擇題Which system provides the highest performance per core, and the least cost for applications licensed per core?()

A.A Power 795 with MaxCore mode
B.A Power 780 with MaxCore mode
C.A Power 755 with TurboCore mode
D.A Power 780 with TurboCore mode

最新試題

A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()

題型:單項(xiàng)選擇題

A customer is evaluating PowerVM and VMware to run a data warehouse application. Which feature of PowerVM should be highlighted as a differentiator?()

題型:單項(xiàng)選擇題

A system is being designed with many LPARs which will be clients of dual VIO Servers. The VIO Servers must be redundant so that, in the event of scheduled maintenance, the clients do not need to be shut down.Which of these strategies could be used to ensure that the client LPARs continue to be able to use the network in the event of a VIO Server being shut down?()

題型:單項(xiàng)選擇題

A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached; One 4-port 1Gbps IVE adapterPowerVM Standard Edition; They need to add a GX++ adapter and cable it to an I/O drawer.Which of the following must also be ordered?()

題型:單項(xiàng)選擇題

A customer would like to configure an uncapped LPAR so that it can use 2 to 8 cores depending on the workload characteristics. With SMT4 enabled, what is the least amount of processing resources which can be configured for the LPAR?()

題型:單項(xiàng)選擇題

Which operating system can directly host managed storage for IBM i, AIX, Linux, VMware and Windows on a Power Systems server?()

題型:單項(xiàng)選擇題

A customer is implementing a POWER Blade solution which requires the VIO Server to be mirrored on internal disk drives. Which Blade supports the requirement?()

題型:單項(xiàng)選擇題

A retail customer has an 8-core Power 740 server with 2 partitions. Production has 4 dedicated cores and the test partition has 2 dedicated cores. Both partitions run during the day without problems. At night, batch processing is exceeding the run window.Which solution addresses this problem without requiring additional  hardware?()

題型:單項(xiàng)選擇題

A POWER7 processor has L1, L2 and L3 caches. Which of the three caches uses embedded DRAM (eDRAM) technology?()

題型:單項(xiàng)選擇題

A customer has an HMC-managed Power Systems server with 6 partitions. Four production partitions are subject to varying workloads throughout the day, and two are used for development and testing. The production applications have different licensing limitations on the number of physical cores that may be used. The development partitions can use no more than 1 core. The customer would like to dynamically optimize processor utilization within the licensing limits, with minimal operator intervention.Which of the following meets the customer requirement?()