A.The new system requires 1 installed processor card for the GX++ bus adapter
B.The new system requires a minimum of 2 installed processor cards for the GX++ bus adapter
C.The new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapter
D.The new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand cluster adapter
您可能感興趣的試卷
你可能感興趣的試題
A.CoD and PCI hot-plug
B.DLPAR and Active Memory Sharing
C.Hot node add and hot node repair
D.D.ynamic processor failure and processor instruction retry
A.Enable automatic problem reporting from smit
B.Use IVM to enable console mirroring to IBM Remote Support.
C.Use the HMC to enable reporting through Electronic Service Agent.
D.Enable Automatic Problem Reporting in ASMI using he embedded modem on the FSP.
A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions.
What is needed to read the exported system plan and design the new system?()
A.e-Config
B.System Planning Tool (SPT)
C.IBM Workload Estimator (WLE)
D.IBM Performance Monitor (PM)
A.0.80
B.0.16
C.1.60
D.0.10
A.Parallel and Serial
B.Serial and Asynchronous
C.Parallel and Synchronous
D.Synchronous and Asynchronous
最新試題
Which of the following items in a single enclosure Power 770 improves Reliability, Availability, and Serviceability?()
A customer has 4 application and 2 database servers that will be installed in partitions on a Power 750. They are concerned that the database software vendor will charge based on every processor core in the server.Which action will reduce the potential vendor software costs?()
Ancustomer with limited storage management skills needs a disk subsystem with up to 70TB capacity and enterprise class performance. Which disk storage system should be recommended?()
A customer requires two 12X loops on their new POWER7 system. What is the smallest system that will support two loops?()
A system is being designed with many LPARs which will be clients of dual VIO Servers. The VIO Servers must be redundant so that, in the event of scheduled maintenance, the clients do not need to be shut down.Which of these strategies could be used to ensure that the client LPARs continue to be able to use the network in the event of a VIO Server being shut down?()
A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs.How can they manage the new machines for the least cost?()
A POWER7 processor has L1, L2 and L3 caches. Which of the three caches uses embedded DRAM (eDRAM) technology?()
Which of the following uses compression/decompression to increase the memory available for client workloads?()
A customer is installing an HMC-managed Power 720 with two partitions, one for Production the other for Testing. They plan to use the Testing partition only occasionally and want to minimize hardware.Which of the following meets these requirements?()