A customer has shut down an LPAR after using DLPAR to add or remove processor and memory resources. When the partition is reactivated, the desired changes are missing.
What action, or sequence of actions, will immediately and permanently solve this problem?()
A.Add or remove the resources in the profile, click 'apply', then 'save'.
B.Add or remove the resources using DLPAR and change the partition profile.
C.Add or remove the resources using DLPAR, then shutdown and reactivate the LPAR.
D.Add or remove the resources in the system profile and reboot the managed system.
您可能感興趣的試卷
你可能感興趣的試題
A customer has a Power 770 running an SAP ERP workload on AIX 7. It has a single partition with 12 cores and 48GB of memory and the CPU is underutilized at 46% with 1000 users. Memory utilization is at 80%. The number of users will increase to 1700, increasing memory utilization by 37%.
Which of the following supports this requirement?()
A.Active Memory Server
B.Active Memory Sharing
C.Active Memory Pooling
D.Active Memory Expansion
A.1
B.2
C.4
D.8
A.Active Energy Manager
B.PowerVM Energy Manager
C.Power and Energy Manager
D.Thermal and Energy Manager
A.Support for a single VIO Server environment
B.Adapters can be dedicated or virtual for each LPAR environment
C.Interfaces with Systems Director to manage the Power Systems servers
D.Supports multiple Power Systems servers from a single point of control
A system is being planned with three production partitions, one each for an IBM i, AIX standard edition, and Power Linux applications. One fibre-channel attached TS3100 tape library will be shared between the partitions for backup.
Which solution provides tape library sharing with minimum operator intervention?()
A.Configure VIO Server Express Edition to control the tape library through one fibre channel card.Assign the library to the production partitions when needed.
B.Configure the IBM i partition to own the tape library.Use IBM i virtualization to host a virtual tape library connection to the AIX and Linux partition.Assign the library to the production partitions when needed.
C.Configure a fibre channel card for each partition, and a configure fibre switch.Connect the partitions and tape library to the switch.Zone the switch so all partitions can enable the tape when needed and disable the tape when finished.
D.Configure AIX to control the tape library through one fibre channel adapter.Use AIX virtualization to host a virtual tape library connection to the IBM i and Linux partitions.Assign the library to the production partitions when needed.
最新試題
Which system provides the highest performance per core, and the least cost for applications licensed per core?()
A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750.Which action allows the most efficient use of existing equipment?()
Which of the following has an integrated database?()
A Power 720 customer using IVM wants to implement dual VIO servers, but is unable to create the second server. What is the most likely reason for this?()
A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs.How can they manage the new machines for the least cost?()
How can resource allocations for an active partition on a Power 750 be changed immediately and permanently?()
A customer has an LPAR with 4 dedicated cores on a POWER7 server with SMT4 enabled. How many logical processors are presented to an application running on this LPAR?()
While using virtualization to share SAN adapters on a server, how does Node Port ID Virtualization (NPIV) differ from Virtual SCSI (vSCSI) related to the use of multipathing software?()
A customer is evaluating PowerVM and VMware to run a data warehouse application. Which feature of PowerVM should be highlighted as a differentiator?()
A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()