單項(xiàng)選擇題When you create a network implementation VLAN solution, what is one procedure that you should include in your plan?()

A.Perform an incremental implementation of components.
B.Following the PPDIOO model, implement the entire solution and then test end-to-end to make sure that it is performing as designed.
C.Implement trunking of all VLANs to ensure that traffic is crossing the network as needed before performing any pruning of VLANs.
D.Test the solution on a segmented portion of a lab network prior to rolling out across the entire network.


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題

You are planning a new VLAN-based network solution. 
What is one item you should consider when creating your implementation plan as it concerns VLANs?()

A.generic router and switch configuration parameters
B.end-to-end test plan after all components have been installed and  configured
C.administrator assignments
D.rollback plan

2.單項(xiàng)選擇題What network information do you need when you plan to implement a VLAN-based solution?()

A.default VLAN information for all unused switch ports
B.802.1x configuration parameters 
C.number of IP subnets needed
D.IP routing protocol information

4.單項(xiàng)選擇題Which Cisco IOS command globally enables port-based authentication on a switch? ()

A.aaa port-auth enable
B.radius port-control enable
C.dot1x system-auth-control
D.switchport aaa-control enable

5.單項(xiàng)選擇題What does the interface subcommand switchport voice vlan 222 indicate?()

A.The port is configured for both data and voice traffic.
B.The port is fully dedicated to forwarding voice traffic.
C.The port will operate as an FXS telephony port.
D.Voice traffic will be redirected to VLAN 222.

最新試題

Refer to the exhibit. For what purpose is the command show ip cef used?()

題型:單項(xiàng)選擇題

What is the configured priority value of the Vlan105’s group on DS2 ?()

題型:單項(xiàng)選擇題

Refer to the exhibit. Initially, LinkA is connected and forwarding traffic. A new LinkB is then attached between SwitchA and HubA. Which two statements are true about the possible result of attaching the second link?()

題型:多項(xiàng)選擇題

Refer to the exhibit. Based on the output of the show spanning-tree command, which statement is true? ()

題型:單項(xiàng)選擇題

During routine maintenance, it became necessary to shutdown G1/0/1 on DS1 and DS2. All other interface were up. During this time, DS1 became the active device for Vlan104’s HSRP group. As related to Vlan104’s HSRP group. What can be done to make the group function properly ? ()

題型:單項(xiàng)選擇題

Refer to the exhibit. What will happen when one more user is connected to interface FastEthernet 5/1? ()

題型:單項(xiàng)選擇題

Refer to the exhibit. All network links are FastEthernet. Although there is complete connectivity throughout the network, Front Line users have been complaining that they experience slower network performance when accessing the server farm than the Reception office experiences. Based on the exhibit, which two statements are true?()

題型:多項(xiàng)選擇題

Which three statements are true of the Link Aggregation Control Protocol (LACP)?()

題型:多項(xiàng)選擇題

Which three statements about STP timers are true?()

題型:多項(xiàng)選擇題

If G1/0/1 on DS1 is shutdown, what will be the current priority value of the Vlan105’s group on DS1 ?()

題型:單項(xiàng)選擇題