A. line timing
B. loop timing
C. internal timing
D. through timing
E. external timing
您可能感興趣的試卷
你可能感興趣的試題
Click the Exhibit button. A customer has several interconnected core rings (see exhibit). They want to create several irtual rings?utilizing their OC-192 backbone (nodes 1,2,3,4). What should you recommend?()
A. PPMN with BLSR rings
B. PPMN with UPSR rings
C. 1:N protection on all core circuits
D. multi-ring interconnect with BLSR rings
A.10
B.32
C.64
D.84
E.96
Click the Exhibit button. Within an ONS 15454, you are provisioning a circuit on an unprotected UPSR ring. In the exhibit, which two must you configure?() (Choose two.)
A. revertive
B. circuit type
C. circuit size
D. bidirectional
E. protected drops
F. switch on PDI-P
A.225 ft
B.450 ft
C.655 ft
D.900 ft
最新試題
Click the Exhibit button. Which type of multiplexer is shown in the exhibit?()
If the power is 0 dBm, what is the power in mW?()
SONET Code Violations (CVs) totals in the PM tables are actually an accumulation of the number of ().
What are three factors that limit the maximum distance of an amplified optical signal without regeneration? ()(Choose three.)
A 2.5 Gb/s (OC-48 or STM-16) optical signal with a dispersion tolerance of 1200 ps/nm goes through fiber with 18ps/nm*km of dispersion. How many 15216-DCU-350 equivalents are needed for enough compensation after traveling 100 km?()
The dispersion of a non-zero dispersion shifted fiber is 6 ps/nm*km at 1550 nm and 10 ps/nm*km at 1610 nm. What is the minimum dispersion compensation required if an L-Band DWDM signal travels through 200 km of fiber and has a dispersion tolerance of 1800 ps/nm?()
Click the Exhibit button. What is the maximum allowable loss budget between the ONS 15216 Mux (left side) composite output and the ONS 15216 Demux (right side) composite input, with the optical values given in the exhibit? ()(Assume the worst case loss of 4.5 dB for 15216 200 GHz Mux/Demux and ignore power penalties or extra margin.)
Click the Exhibit button. When designing a DWDM system with multiple amplified spans, a pre-amp is needed at Site B to (). (Choose three.)
In order to avoid misconnections due to a failed node in a Bidirectional Line Switched Ring (BLSR), Alarm Indication Signals (AISs) are sent on every channel normally terminating in that node. What is the name of this process?()
Why are the 1300 nm and 1550 nm regions of the fiber spectrum primarily used for optical communications?()