單項(xiàng)選擇題Where is specific information regarding height, width, depth, and weight of a Power Systems server located?()

A.Hardware InfoCenter
B.System Planning Tool
C.Offering Information website
D.Technical Delivery and Assessment Guide


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題Which of the following is a compelling reason to deploy IBM Systems Director Active Energy Manager (AEM) in a data center with high energy utilization?()

A.Removes the requirement for Intelligent PDUs
B.Monitor and balance disk speeds according to utilization needs
C.Is a required element forEnergyStar certification of the server/data center
D.Monitor and report power and thermal trending to optimize energy consumption "Pass Any Exam.  AnyTime." - 14 IBM 000-106: Practice Exam

3.單項(xiàng)選擇題

A customer has an HMC-managed Power Systems server with 6 partitions. Four production partitions are subject to varying workloads throughout the day, and two are used for development and testing. The production applications have different licensing limitations on the number of physical cores that may be used. The development partitions can use no more than 1 core. The customer would like to dynamically optimize processor utilization within the licensing limits, with minimal operator intervention.
Which of the following meets the customer requirement?()

A.Define the production partitions' maximum CPU to the licensing limitations.  Define the development/test partition maximums to one core. Configure each partition to be capped.
B.Define the production partitions' maximum CPU to the licensing limitations.  Define the development/test partition maximums to one core. Configure each partition to be uncapped.
C.Define the production partitions' maximum CPU to the licensing limitations.  Define the development/test partitions to use no more than one core. Configure the HMC scheduler to  dynamically assign processors among the pools over a day.
D.Create a shared processor pool for each production partition, with the maximum processor limit set to the  licensing limit for the application in the pool. Assign the development and testing partitions to a processor  pool with a maximum of 1 core. Configure each partition to use uncapped processing.

4.單項(xiàng)選擇題Which of the following items in a single enclosure Power 770 improves Reliability, Availability, and Serviceability?()

A.Redundant system clocks
B.Redundant service processors
C.eDRAM chips have redundant L3 cache
D.Main memory DIMMs contain a redundant DRAM chip

7.單項(xiàng)選擇題Which of the following has an integrated database?()

A.AIX
B.IBM i
C.Linux
D.VIO Server

8.單項(xiàng)選擇題Which of the following configuration is valid for expansion drawers on a Power 750 with 2 processor board sinstalled?()

A.3 PCI-e I/O drawers and 1 PCI-X I/O drawer
B.4 PCI-e I/O drawers and 4 RIO-2 I/O drawers
C.2 PCI-e I/O drawers and 4 PCI-x I/O drawers
D.4 PCI-e I/O drawers and 2 PCI-X I/O drawers

9.單項(xiàng)選擇題

A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3).
Which of these statements is true and would minimize the cost?()

A.All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or  later
B.The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be  managed by this new HMC
C.They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based  systems connected to the existing one
D.The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the  POWER5 and POWER6 based servers to IVM

10.單項(xiàng)選擇題While using virtualization to share SAN adapters on a server, how does Node Port ID Virtualization (NPIV) differ from Virtual SCSI (vSCSI) related to the use of multipathing software?()

A.NPIV andvSCSI both require multipathing in VIO Server only.
B.NPIV requiresmultipathing software on client LPARs, vSCSI requires multipathing software on VIO Server.
C.NPIV requiresmultipathing software on VIO Server, vSCSI requires multipathing software on client LPARs.
D.NPIV requiresmultipathing and MPIO software on VIO Server LPARs, vSCSI requires multipathing   software on VIO Server and MPIO on client LPARs.

最新試題

Which operating system can directly host managed storage for IBM i, AIX, Linux, VMware and Windows on a Power Systems server?()

題型:單項(xiàng)選擇題

A retail customer has an 8-core Power 740 server with 2 partitions. Production has 4 dedicated cores and the test partition has 2 dedicated cores. Both partitions run during the day without problems. At night, batch processing is exceeding the run window.Which solution addresses this problem without requiring additional  hardware?()

題型:單項(xiàng)選擇題

A customer is implementing a POWER Blade solution which requires the VIO Server to be mirrored on internal disk drives. Which Blade supports the requirement?()

題型:單項(xiàng)選擇題

While using virtualization to share SAN adapters on a server, how does Node Port ID Virtualization (NPIV) differ from Virtual SCSI (vSCSI) related to the use of multipathing software?()

題型:單項(xiàng)選擇題

A customer wants to implement the following Blades in BladeCenter H:Two POWER Blades running IBM i partitions.Two POWER Blades running AIX and LinuxFour x86 Blades running Windows.Which of the following design consideration statements is correct?()

題型:單項(xiàng)選擇題

A customer is evaluating PowerVM and VMware to run a data warehouse application. Which feature of PowerVM should be highlighted as a differentiator?()

題型:單項(xiàng)選擇題

Which system provides the highest performance per core, and the least cost for applications licensed per core?()

題型:單項(xiàng)選擇題

A customer requires their application to have high availability within a data center, and also the ability to recover at a data center located 600km away in the event of an outage.Which system software solution component supports the customer requirement?()

題型:單項(xiàng)選擇題

A company plans to deploy a two-enclosure, 23-core Power 780 system with AIX, IBM i and Linux in thefollowing configuration: 3 AIX partitions with dedicated network and disk adapters; 1 native IBM i partition acting as a host1 hosted IBM i partition; 2 hosted Linux partitions.Which configuration will provide boot disk capability to all partitions?()

題型:單項(xiàng)選擇題

A customer has an HMC-managed Power Systems server with 6 partitions. Four production partitions are subject to varying workloads throughout the day, and two are used for development and testing. The production applications have different licensing limitations on the number of physical cores that may be used. The development partitions can use no more than 1 core. The customer would like to dynamically optimize processor utilization within the licensing limits, with minimal operator intervention.Which of the following meets the customer requirement?()

題型:單項(xiàng)選擇題