單項(xiàng)選擇題

A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3).
Which of these statements is true and would minimize the cost?()

A.All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or  later
B.The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be  managed by this new HMC
C.They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based  systems connected to the existing one
D.The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the  POWER5 and POWER6 based servers to IVM


您可能感興趣的試卷

最新試題

A system is being designed with many LPARs which will be clients of dual VIO Servers. The VIO Servers must be redundant so that, in the event of scheduled maintenance, the clients do not need to be shut down.Which of these strategies could be used to ensure that the client LPARs continue to be able to use the network in the event of a VIO Server being shut down?()

題型:單項(xiàng)選擇題

How can resource allocations for an active partition on a Power 750 be changed immediately and permanently?()

題型:單項(xiàng)選擇題

Which of the following has an integrated database?()

題型:單項(xiàng)選擇題

Which of the following is a compelling reason to deploy IBM Systems Director Active Energy Manager (AEM) in a data center with high energy utilization?()

題型:單項(xiàng)選擇題

A POWER7 processor has L1, L2 and L3 caches. Which of the three caches uses embedded DRAM (eDRAM) technology?()

題型:單項(xiàng)選擇題

An end user is deploying Blade servers to replace obsolete rack mounted servers. In addition to AIX Web server and database workloads, they also have Windows workloads.Which Blade is designed for Windows workloads?()

題型:單項(xiàng)選擇題

A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()

題型:單項(xiàng)選擇題

A Power 720 customer using IVM wants to implement dual VIO servers, but is unable to create the second server. What is the most likely reason for this?()

題型:單項(xiàng)選擇題

A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3).Which of these statements is true and would minimize the cost?()

題型:單項(xiàng)選擇題

Which operating system can directly host managed storage for IBM i, AIX, Linux, VMware and Windows on a Power Systems server?()

題型:單項(xiàng)選擇題