單項選擇題

You have just created a new VLAN on your network for inter-VLAN routing.  
What is one step that you should include in your VLAN-based implementation and verification plan?()

A.Verify that different native VLANs exist between two switches for security purposes.
B.Verify that the switch is configured to allow for trunking on the switch ports.
C.Verify that each switch port has the proper IP address space assigned to it for the new VLAN. 
D.Verify that the VLAN virtual interface has been correctly created and enabled.


您可能感興趣的試卷

你可能感興趣的試題

1.單項選擇題

You have just created a new VLAN on your network for inter-VLAN routing. 
What is one step that you should include in your VLAN-based implementation and verification plan?()

A.Verify that different native VLANs exist between two switches for security purposes.
B.Verify that the switch is configured to allow for trunking on the switch ports.
C.Verify that each switch port has the proper IP address space assigned to it for the new VLAN. 
D.Verify that the VLAN virtual interface has been correctly created and enabled.

2.單項選擇題

You have just created a new VLAN on your network.
 What is one step that you should include in your VLAN-based implementation and verification plan? ()

A.Verify that trunked links are configured to allow the VLAN traffic.
B.Verify that the switch is configured to allow for trunking on the switch ports.
C.Verify that each switch port has the correct IP address space assigned to it for the new VLAN.
D.Verify that different native VLANs exist between two switches for security purposes.

3.單項選擇題

You have just created a new VLAN on your network.
 What is one step that  you should include in your VLAN based implementation and verification plan? ()

A.Verify that different native VLANs exist between two switches for security purposes.
B.Verify that the VLAN was added on all switches with the use of the show vlan command. 
C.Verify that the switch is configured to allow for trunking on the switch ports.
D.Verify that each switch port has the correct IP address space assigned to it for the new VLAN.

4.單項選擇題What is a critical piece of information that you should have when creating a VLAN-based implementation plan?()

A.approval from senior management
B.end-user requirements
C.IEEE 802.1X authentication parameters
D.a summary implementation plan

5.單項選擇題When you create a network implementation VLAN solution, what is one procedure that you should include in your plan?()

A.Perform an incremental implementation of components.
B.Following the PPDIOO model, implement the entire solution and then test end-to-end to make sure that it is performing as designed.
C.Implement trunking of all VLANs to ensure that traffic is crossing the network as needed before performing any pruning of VLANs.
D.Test the solution on a segmented portion of a lab network prior to rolling out across the entire network.

最新試題

Which three statements about STP timers are true?()

題型:多項選擇題

Refer to the exhibit. What command was issued on the Layer 3 switch Sw1 between Exhibit #1 and Exhibit #2?()

題型:單項選擇題

Which two statements are true about BPDU port-guard and BPDU filtering?()

題型:多項選擇題

Refer to the exhibit. Switch 15 is configured as the root switch for VLAN 10 but not for VLAN 20. If the STP configuration is correct, what will be true about Switch 15?()

題型:單項選擇題

Refer to the exhibit. STP has been implemented in the network. Switch SW_A is the root switch for the default VLAN. To reduce the broadcast domain, the network administrator decides to split users on the network into VLAN 2 and VLAN 10. The administrator issues the command spanning-tree vlan 2 root primary on switch SW_A. What will happen as a result of this change?()

題型:單項選擇題

Examine the diagram. A network administrator has recently installed the above switched network using 3550s and would like to control the selection of the root bridge.Which switch should theadministrator configure as the root bridge and which configuration command must theadministrator enter to accomplish this?()

題型:單項選擇題

What two things will occur when an edge port receives a BPDU?()

題型:多項選擇題

Refer to the exhibit and the partial configuration of switch SW_A and SW_B. STP is configured on all switches in the network. SW_B receives this error message on the console port:00:06:34: %CDP-4-DUPLEX_MISMATCH: duplex mismatch discovered on FastEthernet0/5 (not half  duplex), with SW_A FastEthernet0/4 (half duplex) , with TBA05071417(Cat6K-B) 0/4 (half duplex). What would be the possible outcome of the problem?()

題型:單項選擇題

Which two statements are true when the extended system ID feature is enabled? ()

題型:多項選擇題

Refer to the exhibit. On the basis of the output of the show spanning-tree inconsistentports command, which statement about interfaces FastEthernet 0/1 and FastEthernet 0/2 is true?()

題型:單項選擇題