單項選擇題A customer is evaluating PowerVM and VMware to run a data warehouse application. Which feature of PowerVM should be highlighted as a differentiator?()

A.PowerVM offers partition mobility.
B.PowerVM can virtualize network and SAN resources.
C.PowerVM supports multiple operating systems running concurrently.
D.PowerVM allows an LPAR to use activated cores and memory without limitation.


您可能感興趣的試卷

你可能感興趣的試題

1.單項選擇題

A company plans to deploy a two-enclosure, 23-core Power 780 system with AIX, IBM i and Linux in the following configuration: 3 AIX partitions with dedicated network and disk adapters; 1 native IBM i partition acting as a host; 1 hosted IBM i partition; 2 hosted Linux partitions. 
Which configuration will provide boot disk capability to all partitions?()

A.Use dual-split backplane in both enclosures for the three AIX partitions and the IBM i partition.
B.Put each partition on a dedicated controller using the triple-split backplane option in both enclosures.
C.Use the triple-split backplane option in one enclosure for the AIX partitions, and the default dual-split backplane for the IBM i partition in the second enclosure.
D.Use the triple-split backplane option in one enclosure for the AIX partitions, and the non-split backplane mode in the second enclosure for the IBM i hosting partition.

2.單項選擇題A customer is deploying a new database on a PS701 Blade in a BladeCenter H, and requires redundant network and SAN adapters. Which configuration supports the customer requirement?()

A.Configure 2 CFFh combination fibre channel / gigabit Ethernet adapters
B.Configure 1 CFFh 2-port fibre channel adapter and 1 CIOv 2-port gigabit Ethernet adapter
C.Configure 1 CIOv 2-port fibre channel adapter and 1 CFFh combination fibre channel / gigabit Ethernet adapter
D.Configure 1 CIOv 2-port gigabit Ethernet adapter and 1 CFFh combination fibre channel / gigabit Ethernet adapter

3.單項選擇題What is the correct stage in the sales process for a Pre-Sales Technical & Delivery Assessment (TDA)? ()

A.Before the first solution design meeting with the customer
B.After the solution design proposal is submitted to manufacturing for review
C.Once the customer has supplied the solution design specifications to the sales team
D.After the solution design is completed and before the proposal is submitted to the customer

4.單項選擇題What is the primary purpose of the Technical and Delivery Assessment (TDA)?()

A.Identify, assess, and mitigate technical risks.
B.Verify pricing and gather components for special bid submission.
C.Verify the proposed solution will fit within the customer's budget.
D.Review competitive offerings, system performance and delivery schedules.

最新試題

A retail customer has an 8-core Power 740 server with 2 partitions. Production has 4 dedicated cores and the test partition has 2 dedicated cores. Both partitions run during the day without problems. At night, batch processing is exceeding the run window.Which solution addresses this problem without requiring additional  hardware?()

題型:單項選擇題

An end user is deploying Blade servers to replace obsolete rack mounted servers. In addition to AIX Web server and database workloads, they also have Windows workloads.Which Blade is designed for Windows workloads?()

題型:單項選擇題

A customer has a 4-core POWER6 570 with 4 partitions and a 2-port 1Gbps Integrated Virtual Ethernet (IVE) Adapter. They are having problems with throughput on the Ethernet adapter and want to improve performance.Which of the following solutions will help the customer with this issue for the least cost and with the least interruption?()

題型:單項選擇題

A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached; One 4-port 1Gbps IVE adapterPowerVM Standard Edition; They need to add a GX++ adapter and cable it to an I/O drawer.Which of the following must also be ordered?()

題型:單項選擇題

A customer has 4 application and 2 database servers that will be installed in partitions on a Power 750. They are concerned that the database software vendor will charge based on every processor core in the server.Which action will reduce the potential vendor software costs?()

題型:單項選擇題

A customer requires two 12X loops on their new POWER7 system. What is the smallest system that will support two loops?()

題型:單項選擇題

While using virtualization to share SAN adapters on a server, how does Node Port ID Virtualization (NPIV) differ from Virtual SCSI (vSCSI) related to the use of multipathing software?()

題型:單項選擇題

A customer is implementing a POWER Blade solution which requires the VIO Server to be mirrored on internal disk drives. Which Blade supports the requirement?()

題型:單項選擇題

A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()

題型:單項選擇題

A Power 720 customer using IVM wants to implement dual VIO servers, but is unable to create the second server. What is the most likely reason for this?()

題型:單項選擇題