您可能感興趣的試卷
你可能感興趣的試題
In project management, a ( )is a list of a project’s milestones, activities, and deliverables, usually with intended start and finish date. Those items are often estimated in terms of resource allocation, budget and duration, linked by dependencies and scheduled events.
A. schedule
B. WBS
C. SOW
D. charter
( )can be considered as part of risk mitigation.
A. Risk identification
B. Purchasing insurance
C. Assessment of outcomes
D. Assessment of probabilities
( )is not the advantage of GERT (Graphical evaluation and review techniques)as compared with PERT (project evaluation and review techniques).
A. Allowing looping
B. Allowing for dummy tasks
C. Allowing branching
D. Allowing multiple project end results
The length of the IPv6 address is ( ).
A. 64 bytes
B. 128 bytes
C. 64 bits
D. 128 bits
A ( )is a software that provides a method of communication between two electronic devices over the World Wide Web.
A. router
B. cober
C. J2EE
D. web service
最新試題
產(chǎn)品能否獲得取決于兩個(gè)要素:()
你是某公司網(wǎng)絡(luò)布線項(xiàng)目的項(xiàng)目經(jīng)理。你的班子成員包括六位全職雇員和三位承包商。他們都是第一次共同工作。你知道班子建設(shè)的步驟將按以順序進(jìn)行:()
工作A悲觀估計(jì)需要36天完成,很有可能21天完成,樂觀估計(jì)只用6天完成,那么工作A從16天到26天之間完成的可能性是()
進(jìn)度計(jì)劃控制一項(xiàng)重要的目的是()
開發(fā)過程的調(diào)整和優(yōu)化發(fā)生在質(zhì)量管理的哪個(gè)階段:()
投資回收期的財(cái)務(wù)分析確定()
以下哪個(gè)管理職能在賣方獲得合同的最后的支付前必須執(zhí)行?()
某項(xiàng)目經(jīng)理剛被聘用,并設(shè)法與他人的合作。在這種狀態(tài)下,他要采用哪種最佳的權(quán)利方式來獲得合作?()
范圍核實(shí)將:()
以下哪項(xiàng)描述了項(xiàng)目執(zhí)行和控制過程的獨(dú)特特征?()